Home / Kitchen Renovation in Malvern / Licensed Trades
REFERENCE PHOTO
What to look at: plumbing lines and electrical points once the walls are open. This is where licensed work usually begins.
PLUMBING
Moving or adding water and waste lines, and connecting sinks and dishwashers. Done by an authorised plumber.
ELECTRICAL
New or relocated power points, lighting, rangehood and appliance circuits. Done by an authorised electrician.
WHO YOU SPEAK TO
Me, Ivan Bodnar, from the first discussion and the on-site assessment through the work.
I’m Ivan Bodnar, an independent home renovation specialist with approximately 15 years’ personal experience in residential renovation. I work as an independent sole trader. I don’t claim unverified trade licences or builder registration, and I don’t carry out licensed plumbing or electrical work myself.
My part of a kitchen renovation covers the assessment, practical options for layout and cabinetry, surface preparation, suitable materials and the finishing work I do myself. Where a regulated component is involved, an appropriately licensed practitioner does it.
ALSO OUTSIDE MY SCOPE
Structural engineering
Architecture and architectural design
Building certification
Asbestos removal
Legal compliance advice
If your kitchen plan touches any of these, it’s flagged at assessment so the right specialist can be involved.
01How the kitchen needs to work
We talk about what you want to change. Moving a sink, adding an island or relocating the cooktop affects services far more than keeping the existing layout. More on this in layout, cabinetry and practical options.
02What is already there
On site I look at existing water and waste connections, power points, appliance positions and access behind the cabinets, alongside the condition of surfaces. See what may be found behind kitchen cabinets.
03Which parts need a licensed trade
Any part of the proposed scope that involves plumbing or electrical work is identified as licensed work, so you know before anything starts which tasks an authorised specialist will do.
04Set out in writing
The free written quotation separates my part of the work from the licensed trade work, so the scope is clear on paper rather than assumed.
Project scope, permits, registration, insurance and licensed trade requirements vary with the work involved. Contract, insurance and approvals wording needs to be checked for each specific project.
An inspection also can’t reveal every concealed issue. If opening a wall or removing a cabinet shows something unexpected in the services, it’s discussed with you before the work goes on.
RELATED READING
Planning to move a sink or add power points? Mention it when you get in touch and I’ll look at it during the on-site assessment in Malvern.