Chapter 06 — Bathroom tiling

Bathroom tiling: check the surface, set it out, then tile.

Bathroom wall and floor tiles sit on a substrate that gets wet every day. Before any tile goes on, I check what is underneath, how flat and sound it is, and where the layout should start so that cuts fall in sensible places. I’m Ivan Bodnar, an independent home renovation specialist. Most of my work on this site is kitchen renovation in Malvern. Bathroom tiling is a related job, and I approach it the same way: preparation comes first.

Bright kitchen with white cabinetry, a hexagonal tiled splashback, open shelving, sink and large range cooker.

Reference image of a tiled wall: flatness, set-out and grout lines are checked before any bathroom tile goes on.

WHAT I CHECK BEFORE TILING

01Substrate
Is the existing sheeting, render or old tile sound, firmly fixed and suitable to tile onto, or does it need to be replaced?

02Moisture
Signs of past leaks, soft areas, staining or damage around the shower, bath and vanity.

03Flatness and falls
How flat the walls are, how level the floor is, and whether the floor falls towards the waste.

04Waterproofing
What is already there, what condition it appears to be in, and what the project needs. This is confirmed at the assessment.

05Setting out
Where the first row starts, and how cuts land at corners, edges, niches and fittings.

Why preparation matters

Tiling over an unsuitable surface often means doing the job twice.

If visible finishes are replaced before anyone checks for moisture, substrate suitability, service access and underlying damage, the result can be avoidable rework. In a bathroom, that can show up as cracked grout, hollow-sounding tiles, lifting edges or moisture coming back through a new finish.

The right scope depends on the inspection. Sometimes the existing surface only needs preparation. Sometimes the old tiles and sheeting have to come off first. An inspection cannot reveal every concealed issue, so anything uncovered once removal starts is discussed with you before work continues. See Surface Preparation and Hidden Conditions.

Waterproofing & regulated work

Waterproofing requirements vary, so they're confirmed on site

Each bathroom is different. It may or may not need new waterproofing, the membrane may need to cover more or less of the floor and walls, and permits or a registered practitioner may or may not be involved. I don’t assume any of this in advance. We go through it at the on-site assessment and it is set out in the written quotation.

Appropriately authorised specialists do any plumbing work, such as moving a waste, a tap or a shower outlet. I’m an independent sole trader and don’t personally claim unverified trade licences or builder registration.

CONFIRMED AT ASSESSMENT

How far the waterproofing needs to go

Whether permits or registration apply

Which plumbing changes need licensed trades

Contract, insurance and approvals wording for your project