A worker using a plastering trowel and hawk to apply finishing compound to an interior wall.

Reference photo: finishing compound going onto a wall. The finish you see later depends on the board and the preparation underneath it.

Home / Kitchen Renovation in Malvern / Surface Preparation

Field 03 — Surfaces

Surface preparation and hidden conditions

Before new tiles, benchtops or cabinets go in, you need to know what they will sit on. During the on-site assessment I look at the wall behind the splashback, the floor under the cabinets, moisture around the sink and dishwasher, and the condition of the plasterboard. What I find shapes the scope.

Finishes are only as good as what they sit on

Replacing visible finishes before checking moisture, substrate suitability, service access and underlying damage can lead to rework you could have avoided. A new splashback on loose plaster, or cabinets set on a soft floor, may look right on the day and still let you down later.

That’s why the right scope depends on the inspection, not on a catalogue picture.

What I check

Four places that are easy to miss

01

Walls behind the splashback

Old tiles and adhesive can hide plaster that is loose, patched or out of plane. A new splashback needs a sound, flat substrate. Where it isn’t there, re-sheeting or plastering may become part of the job.

02

Floors under cabinetry

Kickboards hide a lot. Under old carcasses the floor may be uneven, damaged or finished differently, and that affects levelling new cabinets and any new flooring.

03

Moisture at the sink and dishwasher

Slow leaks at traps, taps and appliance connections can swell particleboard and soften the wall or floor. I look for swollen base panels, staining and a musty smell. Any plumbing repair goes to a licensed plumber.

04

Plasterboard condition

Cracks, soft spots, old fixings and earlier cut-outs often show once wall cabinets come down. Some can be repaired. Other boards are better replaced before the new finishes go on.

Scope

Where preparation fits in the scope

Preparation isn’t an extra tacked on at the end. If the assessment shows it’s needed, such as removing old adhesive, patching or replacing plasterboard, levelling or leaving access for services, I set it out in the written quotation. That way you can see what the new finishes depend on.

Where services need changing, the plumbing and electrical work is done by appropriately authorised specialists, not by me. I’m an independent sole trader and don’t claim unverified trade licences or builder registration. See licensed trades.

An unfinished interior showing drywall, exposed ductwork, plumbing lines, electrical points and a concrete floor.

Reference photo: with the linings open, plumbing lines and electrical points are visible. This is the stage where service access is planned.

What an inspection can't show

The assessment is practical. I open cupboards, look under the sink, check level and test surfaces by hand. Even so, an inspection can’t reveal every concealed issue, and some conditions only appear once cabinets, tiles or benchtops come out. If something turns up, I’ll explain what it is, talk through the practical options and agree any change in scope with you before carrying on.

Project scope, permits, registration, insurance and licensed trade requirements vary from job to job. Contract, insurance and approvals wording is checked for each specific project. More detail is in Terms of Use and Important Information.