SERVICE 01 · MALVERN, VICTORIA
Reference photograph · handleless fronts, slab splashback returned from the benchtop, timber floor run under the cabinetry line.
01
COMPLETE RENOVATIONS
STRUCTURE & SERVICES
Demolition · plumbing and electrical rough-in · wall and floor preparation
CABINETRY & STORAGE
Measured joinery · door profile and finish · drawer and corner systems
SURFACES & FINISHING
Templated stone · tiled or full-height slab · appliance integration
Three different jobs are often described with the same word. The difference is how much of the existing kitchen survives the first day on site.
COMPLETE RENOVATION
Scope
Full strip-out and rebuild
What stays
Nothing beyond the shell
Services
Re-run to the new plan
Best when
The kitchen is tired and the plan no longer suits the household
REMODELLING
Scope
Layout and wall lines change
What stays
Varies with the structure
Services
Relocated, often extensively
Best when
Circulation is the problem — see kitchen remodelling
MAKEOVER
Scope
Doors, benchtop, splashback, hardware
What stays
Sound carcasses and the layout
Services
Largely untouched
Best when
The plan works and only surfaces date it — see kitchen makeovers
Reference photograph · sample comparison at selection stage.
SELECTION STAGE
01 Consultation — brief, constraints, condition
02 Measure — the room as built
03 Design — layout, elevations, storage
04 Quote — scope itemised against the drawing
05 Material selection — samples confirmed
06 Removal & demolition — strip to substrate
07 Services preparation — plumbing, power, light
08 Cabinetry — carcasses set and levelled
09 Benchtops — templated, then installed
10 Splashback — measured off the finished bench
11 Appliances & finishing — fit-off and adjustment
12 Handover — clean, check, documentation
SCOPE & DISRUPTION